Housing and communal service

Power Industry

The regional power consumption during 9 months of 2018 amounted to 3486.5 million kW/h that is 2.1% higher compared to the same period of the last year (3412.3 million kW/h.). The increase in power consumption can be defined to the introduction of new production facilities at large industrial enterprises.

The volume of internal power generation in the region for the current period amounted to 674.1 million kW/h that is 16.7% lower compared to the same period of the last year (809.4 million kWh). The reduction in the power generation volume is due to the decrease in the amount of power produced by Rudnenskaya CHP for own needs, which can be explained by the change in the operating equipment.

Thermal energy production for 7 months of 2018 amounted to 2609.2 thousand GKal, which is higher by 9.1% compared to the same period of 2017.

Gas Supply

68 regional settlements out 556 settlements are provided with natural gas, including the cities of Kostanay, Rudniy, Lisakovsk and Zhitikara and some villages of Altynsary, Zhitikara, Denisov, Karabalyk, Kostanay, Taran and Kamysty districts.

The total length of the distribution gas pipelines of the region as of August 1, 2018 is 3418.87 km.

The natural gas consumption volume for 9 months of 2018 increased compared to the last year (519.5 million cubic meters) by 12.5 % and amounted to 584.5 million cubic meters.

The increase in natural gas consumption is associated with introduction of new production facilities at large industrial enterprises and gasification of settlements.

Within the framework of the Tripartite Memorandum between Akimat of Kostanay region, KazMunaiGas JSC and KazTransGas JSC with a total value of 13.4 billion tenge, in 2018 the local budget allocated 2.1 billion tenge for the implementation of 4 investment projects, 3 of which shall be completed in the current year (gasification of Fedorovka village I stage of blocks 41-56 and microdistrict 3 of Rudniy city, Amankaragay of Auliekol district), and works under the rest one will be completed in 2019 (gasification of Auliyekol village).

In the framework of the Memorandum, Kostanay Production Branch of KazTransGas Aimak JSC implements the project of Tobol-Auliekol main gas pipeline construction with automated gas distribution station in the village of Auliekol in 2018.

Water Supply and Water Discharge

As of October 1, 2018, 177 out of 556 settlements (31.8%) are provided with centralized water supply from group and local water supply systems, 30 settlements (5.4%) are supplied with drinking water, 349 settlements (62.8%) are provided with water from decentralized water supply sources (wells, drill holes).

In order to improve the water supply of settlements under the Regional Development program until 2020, in 2018 there were allocated funds from national and local budgets in the amount of 9.7 billion tenge for the implementation of 25 projects for water supply and sanitation (4 of the are urban and 21 are rural) that is 3.6 times more than for the last year.

By the end of 2018, it is planned to put into operation 9 rural water supply facilities out of 25 projects for water supply and water discharge. This shall improve water supply for 8 villages with 50.5 thousand people; for the first time 2 villages (Arka and Agashtykol) with 1.9 thousand people will be connected to the water supply system, while in the regional centralized water supply of villages will increase from 30.8% to 31.2% (from 169 villages to 171). The remaining 16 projects are transferred to 2019.

This year, the implementation of the Nurly Zhol state program shall continue. In 2017, a budget loan in the amount of 2.1 billion tenge was allocated from the national Fund of the Republic of Kazakhstan for the implementation of 2 projects on water disposal (cities of Kostanay and Rudniy), with the period of development until December 10, 2018.

Following the results of the 1st quarter of 2018, the project on Reconstruction of D-1200 mm Gravity Flow Sewer along Kairbekov street within the blocks of Ordzhonikidze and Kurgan Streets of Kostanay with a total length of 2.8 km was put into operation.

Works according to the project of water disposal in Rudniy worth 1.4 billion tenge (Transportation of Biologically Treated Water from Waste Water Treatment Plant to Vasilyevskiy Evaporator in Rudniy) are underway. The commissioning of the facility is scheduled to November 15, 2018. As a result of the project, 8.9 km of sewerage networks shall be reconstructed.